|
|
From
the condition survey work and reports OPERON
analyse and prioritise the work to be
carried out using a number of criteria typically:
•
Compliance with Statutory and Legislative
Health and Safety and Environmental
Requirements
•
Work required to prevent or rectify major
damage or deterioration and which will
affect
the asset value •
Works that will affect comfort
• Works
that will affect aesthetics or perceptions
and trading performance
• Works,
which will affect a saving in running and
maintenance, cost. This information
would
be set up on either spreadsheet or database
format and would provide a forward
works
plan to predict and control expenditure.
|
|